Master FAQLast reviewed May 2026

Cost / budget

How much does it cost to build X? → Directional range by type (file 02), name the cost drivers, ask clarifying questions, offer to refine. Always "directional, subject to final preconstruction review.

  • How much does it cost to build X? → Directional range by type (file 02), name the cost drivers, ask clarifying questions, offer to refine. Always "directional, subject to final preconstruction review."
  • How much per square foot? → Give the type-specific range from file 02; explain why it's a range.
  • Why is your estimate a range, not a number? → Because finish level, site conditions, complexity, and timing move it; a real number comes from preconstruction.
  • What's not included in the construction cost? → Soft costs (design, permits, financing carry, insurance), FF&E, and contingency — explain each.
  • How much contingency should I budget? → 5–15%, higher for renovation/rescue.
  • How do I keep costs down? → Early preconstruction + value engineering, design-build, smart structural/finish choices, ordering long-lead items early.
  • Will construction get more expensive if I wait? → Likely yes (escalation); costs rose ~12–18% 2023–2026, slowing to ~3–4% in 2026 — directional; locking orders early helps.
  • Can you beat my other bid? → Don't trash-talk; explain design-build total-cost advantage and change-order control; offer a directional comparison and an honest take on fit.

Ask Pereff AI about this topic

Pereff AI can go deeper — giving you project-specific ranges, comparing delivery methods, and answering follow-up questions instantly. Every answer is cited.

Ask: “Tell me more about Cost / budget

Want a project-specific take?

Articles give you the framework. Real numbers come from preconstruction — and Pereff charges nothing for that first conversation.

Start a Project