What drives cost UP

Specialty MEP density — operatories, commercial kitchens, lab gas, sterile/negative-pressure HVAC zoning. Imaging / shielding — lead-lined rooms (X-ray, CT, cone-beam) add cost and structural needs. F

  • Specialty MEP density — operatories, commercial kitchens, lab gas, sterile/negative-pressure HVAC zoning.
  • Imaging / shielding — lead-lined rooms (X-ray, CT, cone-beam) add cost and structural needs.
  • Finish level — premium materials, custom millwork, amenity spaces.
  • Structural choices — steel vs. tilt-up vs. CMU can swing cost 10–25%; foundation type can swing ~20% on bad soils.
  • Site conditions — poor soils, demolition, utility extension, detention/drainage, grading.
  • Speed — compressed schedules (overtime, premium procurement) cost more.
  • Sustainability — LEED Silver adds ~1–3%, LEED Gold ~3–5% (also unlocks tenant/institutional demand).
  • Escalation — building later costs more in an inflationary market; locking material orders early protects budget.

Ask Pereff AI about this topic

Pereff AI can go deeper — giving you project-specific ranges, comparing delivery methods, and answering follow-up questions instantly. Every answer is cited.

Ask: “Tell me more about What drives cost UP

Want a project-specific take?

Articles give you the framework. Real numbers come from preconstruction — and Pereff charges nothing for that first conversation.

Start a Project