Skip to content
GlossaryLast reviewed May 2026

Building & site

Shell (cold/gray shell) — bare building: structure, envelope, roof, maybe stubbed utilities. Vanilla shell / vanilla box — shell + basic interior (walls, basic HVAC, lighting, restrooms). Tenant impro

  • Shell (cold/gray shell) — bare building: structure, envelope, roof, maybe stubbed utilities.
  • Vanilla shell / vanilla box — shell + basic interior (walls, basic HVAC, lighting, restrooms).
  • Tenant improvement / finish-out (TI) — building out a leased interior for a tenant.
  • Ground-up — building new from the dirt.
  • Tilt-wall / tilt-up — concrete wall panels cast on-site and tilted into place (common DFW industrial/retail).
  • Clear height — interior height to the lowest overhead obstruction (key for warehouses).
  • MEP — Mechanical, Electrical, Plumbing systems.
  • Civil / sitework — grading, drainage/detention, paving, utilities.
  • Entitlements — zoning/land-use approvals allowing a project to proceed.
  • Change of use — converting a building's occupancy type (often triggers added code).
  • AHJ (Authority Having Jurisdiction) — the city/county that permits and inspects.
  • ICRA — Infection Control Risk Assessment (construction in/near active healthcare).

Ask Pereff AI about this topic

Pereff AI can go deeper — giving you project-specific ranges, comparing delivery methods, and answering follow-up questions instantly. Every answer is cited.

Ask: “Tell me more about Building & site

Want a project-specific take?

Articles give you the framework. Real numbers come from preconstruction — and Pereff charges nothing for that first conversation.

Start a Project