Project phases & documents

Feasibility / programming — defining what/where/how-big/roughly-how-much; locks 60–80% of cost. Preconstruction (precon) — detailed budgeting, VE, scheduling, permitting strategy before building. SD /

  • Feasibility / programming — defining what/where/how-big/roughly-how-much; locks 60–80% of cost.
  • Preconstruction (precon) — detailed budgeting, VE, scheduling, permitting strategy before building.
  • SD / DD / CDs — Schematic Design → Design Development → Construction Documents (increasingly detailed drawings).
  • RFI (Request for Information) — formal question from builder to designer to clarify drawings.
  • Submittal — product data/shop drawings submitted for approval before installation.
  • Punch list — the final list of items to fix/complete before the job is accepted.
  • As-builts — drawings updated to reflect what was actually built.
  • Commissioning — testing/verifying building systems work as designed.
  • CO (Certificate of Occupancy) — city approval that a building can legally be occupied. TCO = temporary CO.

Ask Pereff AI about this topic

Pereff AI can go deeper — giving you project-specific ranges, comparing delivery methods, and answering follow-up questions instantly. Every answer is cited.

Ask: “Tell me more about Project phases & documents

Want a project-specific take?

Articles give you the framework. Real numbers come from preconstruction — and Pereff charges nothing for that first conversation.

Start a Project